Expert Local Advice
Professional Prep Equipment
Premium Products
Based in Dromana
Dribond

Concrete Hardener

Dribond Concrete Hardener is a clear fluorosilicate solution that permanently case hardens dusty, soft or poorly cured concrete and cement-based surfaces. It penetrates into the capillary spaces of the concrete and chemically reacts with free lime to bond and strengthen the crystalline structure — increasing hardness by up to 300% compared to untreated concrete. Available in 20L. Used by flooring contractors, concreters and builders across Australia.

Get a Quote
or call Frank: 0417 338 506
PDF
Download Data Sheet Product technical data sheet
  • Easy to apply – sweep or brush on with a broom, mop or squeegee
  • Permanently case hardens dusty or soft concrete or cement based structures by up to 300% of untreated concrete
  • Dustproofs by bonding and strengthening the cement’s crystalline structure
  • Substantially increases the chemical and abrasion resistance
  • Seals the structure against moisture penetration.

Suitable for warehouse floors, factory floors, driveways, paths and any concrete surface that is soft, dusty or poorly cured. New surfaces must have cured for at least 14 days and be free from curing compounds, dirt and contaminants. Existing surfaces must be free of dirt, wax, grease and other contaminants. Apply two coats at 1 litre per 4m2 per coat using a mop, hair broom or squeegee, allowing 4-6 hours between coats.

Download the full product data sheet for detailed technical information, safety data, and application guidelines.

Download Data Sheet (PDF)
  • Easy to apply – sweep or brush on with a broom, mop or squeegee
  • Permanently case hardens dusty or soft concrete or cement based structures by up to 300% of untreated concrete
  • Dustproofs by bonding and strengthening the cement’s crystalline structure
  • Substantially increases the chemical and abrasion resistance
  • Seals the structure against moisture penetration.

Suitable for warehouse floors, factory floors, driveways, paths and any concrete surface that is soft, dusty or poorly cured. New surfaces must have cured for at least 14 days and be free from curing compounds, dirt and contaminants. Existing surfaces must be free of dirt, wax, grease and other contaminants. Apply two coats at 1 litre per 4m2 per coat using a mop, hair broom or squeegee, allowing 4-6 hours between coats.

Download the full product data sheet.

Download PDF
Call Now Get a Quote